Every web project we run follows the same six-week skeleton. Clients ask for it on the first call, so here it is in full — including the two gates that actually decide whether you launch on time.

Week 0: the scope call

One hour, all four of us, one decision-maker on your side. You leave with a written scope, a fixed price and a start date. Nothing starts until that document is signed — not because we like paperwork, but because scope written down is scope you can hold us to.

Weeks 1–2: two directions

We design your homepage two different ways, on your real content. Not mood boards, not style tiles — two finished-looking homepages built from your actual headline, your actual photography, your actual prices.

Gate one: you pick a direction by the end of week two. This is the first of the two dates that can move your launch.

Why only two directions? Because five options is a way to avoid deciding. Two real ones force the useful conversation: what is this site actually for?

Weeks 3–4: every page, in the browser

The chosen direction extends to every page — and it happens in code, on a staging link you can open on your own phone the same day. There is no "final mockup" stage. The mockup is the site.

  • Monday drops: staging updates land at the start of each week.
  • Real device checks: we test on the phones your analytics say your visitors use.
  • Content deadline: your final copy and imagery are due by the end of week three. This is gate two.

Week 5: content and polish

Final copy goes in, images get set, loading and motion get tuned. You get one structured feedback round: everything in a single list, everything answered, nothing drip-fed over eleven emails.

Week 6: launch and handover

DNS, redirects, launch checklist, and then the part most agencies skip: a one-hour handover session where we teach your team to edit the site without us. Files, repo, accounts — yours.

The honest part

In seven years, only one thing has ever delayed a launch: feedback arriving late at the two gates. Not technology, not design disagreements — calendars. Hold the two gates and the date holds itself.

Book this scope